[Q36-Q54] Pass SAP Certified Application Associate - SAP IBP for Supply Chain Exam in First Attempt Guaranteed Updated Dump from Prep4away!

Share

Pass SAP Certified Application Associate - SAP IBP for Supply Chain Exam in First Attempt Guaranteed Updated Dump from Prep4away!

Pass C_IBP_2208 Exam with 80 Questions - Verified By Prep4away


SAP C_IBP_2208 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe the benefits of implementing SAP's Integrated Business Planning solution
  • Configure supply planning, run various solvers to generate planning result
Topic 2
  • Display, create, copy, edit, check, and activate a planning area
  • Planning Operators & Application Jobs
Topic 3
  • Define and view information with user-defined charts and dashboards
  • General Configuration of a Planning Area
Topic 4
  • Optimize inventory in the supply chain utilizing algorithms that derive inventory targets
  • Create and use key figures and attributes
Topic 5
  • Create statistical forecast using historical data with basic methods
  • Supply planning integrated with financial plans

 

NEW QUESTION 36
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.

  • A. Leveraging the functionality of SAP Workzone
  • B. Using Microsoft Excel planning views
  • C. Leveraging the web-based planning capability
  • D. Using Driver-Based planning

Answer: B,C

 

NEW QUESTION 37
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Add a new time profile level to the time profile.
  • B. Change the past and future horizon of the levels in the time profile.
  • C. Change the numbering hierarchy of the period IDs in the time profile.
  • D. Change the description of the attributes in the time profile.

Answer: B,D

 

NEW QUESTION 38
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.

  • A. Periodic lot size setting overrides the minimum lot size.
  • B. Lot sizes are applicable for production and handling quantities.
  • C. Lot sizes are time-independent master data settings.
  • D. Lot sizes are applicable for production and transportation quantities.

Answer: B,C

 

NEW QUESTION 39
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Geographic Chart Types
  • B. Trend Chart Types
  • C. Comparison Chart Types
  • D. Seasonal Chart Types
  • E. Simulation Chart Types

Answer: B,C,D

 

NEW QUESTION 40
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.

  • A. A forecast metric key figure, such FCSTMAPE
  • B. A currency conversion key figure, such as exchange rate
  • C. A special key figure marked as an aggregate key figure (aggregate constraint)
  • D. A unit of measure key figure, such as UOMCONVERSIONFACTOR

Answer: C,D

 

NEW QUESTION 41
You define fixing for a key figure.Which of the following functions are available for this key figure? Note: There are 2 correct answers to this question.

  • A. Fixing is possible for a certain quantity of a key figure value.
  • B. Fixing is possible for manually editable key figures.
  • C. Fixing is possible for system editable key figures.
  • D. Fixing is possible for a certain period, including all child values in the hierarchy.

Answer: C,D

 

NEW QUESTION 42
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.

  • A. Cloud Identity Authentication Service
  • B. Cloud Integration for Data Services
  • C. Real-time Integration
  • D. Smart Data Integration

Answer: B,D

 

NEW QUESTION 43
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand.Which solutions would apply to this scenario?Note: There are 2 correct answers to this question.

  • A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs.
  • B. Excess stock can be generated and will need to be staged in an overflow warehouse.
  • C. Capacity leveling will be possible for production and storage resources.
  • D. Minimum capacity utilization will result in pull production occurring.

Answer: A,B

 

NEW QUESTION 44
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.

  • A. Substitute missing values in case of sporadic demands.
  • B. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".
  • C. Identify inventory items that require closer attention.
  • D. Choose time-independent key figures as segmentation measures.

Answer: C,D

 

NEW QUESTION 45
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.

  • A. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.
  • B. Set up a three-tier landscape using transport, starting from the development system to test and production.
  • C. Create additional planning areas in the test system to support training needs.
  • D. Create additional test planning areas in the production system to support cutover needs.

Answer: A,B

 

NEW QUESTION 46
You create a planning filter using an SAP IBP Fiori app.Which of the following objects can it be applied to?Note: There are 2 correct answers to this question.

  • A. Snapshot operator in the SAP IBP add-in for Microsoft Excel
  • B. Planning view templates in the SAP IBP add-in for Microsoft Excel
  • C. Supply chain graph in Supply Chain Network app
  • D. Jobs in the Applications Jobs app

Answer: B,D

 

NEW QUESTION 47
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.

  • A. Only attribute-based totals can be added to the planning view.
  • B. The values of the attribute-based total at the highest attribute level in the planning level can be changed.
  • C. The total number of attributes that can use subtotals in the planning view can be restricted.
  • D. The total value can be added before or after the selected attribute.

Answer: C,D

 

NEW QUESTION 48
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.

  • A. Purge Key Figure Data
  • B. Purge Master Data
  • C. Purge Non-Conforming Data
  • D. Create Time Periods for Time Profiles

Answer: A,B

 

NEW QUESTION 49
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.

  • A. Activate Local Member Recognition setting is selected.
  • B. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
  • C. Users should have authorization for template administration.
  • D. Use Excel Cell References in the Report Editor option is selected.

Answer: A,C

 

NEW QUESTION 50
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.

  • A. Target key figures for these snapshots are exposed to the user in planning views.
  • B. The number of lag-based snapshots are limited to nine levels.
  • C. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
  • D. Lag-based snapshots are created in the Configuration app for a fixed time range.

Answer: C,D

 

NEW QUESTION 51
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.

  • A. Not respecting production capacity
  • B. Violation of minimum aggregated inventory values
  • C. Not adhering to maximum transport values
  • D. Not-fully satisfied demands
  • E. Violation of minimum resource utilization

Answer: B,D,E

 

NEW QUESTION 52
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?

  • A. This application job can be run for multiple time profiles at once.
  • B. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
  • C. The assigned Planning Area must be active.
  • D. A time profile has to be activated so that the application job can proceed.

Answer: B

 

NEW QUESTION 53
SAP IBP ensures interoperability with which applications?Note: There are 2 correct answers to this question.

  • A. User management in SAP Success Factors
  • B. Business Network in SAP Ariba
  • C. Financial Planning in SAP Analytics Cloud
  • D. Salesforce Sales Cloud

Answer: B,C

 

NEW QUESTION 54
......